Audit of energy saving solutions

Any audit is a first step towards clarity and solutions. Traditionally, resource and energy efficiency solutions are very complex and cover many areas. Approached from only one angle, the information is incorrect, the results are inaccurate, and instead of improving the situation, the end result may even worsen the situation.

The audit begins with the collection of source data, in the framework of which it is important for the contracting authority to provide source data that is as accurate and up-to-date as possible. The more accurate the source data, the more accurate the payback periods, energy cost estimates and solution costs calculated in the final audit.

auditeerimise on esimene samm

Mapping and measurements

In order to analyse and map the building data, the relevant experienced engineers will be involved in the project, who will work through the source information and, during the mapping, assess the current state of the technical systems and identify solutions to improve the existing situation. Unlike a classic energy audit, the audit of energy saving solutions involves various measurements, including indoor climate (temperature, CO2, relative humidity), light levels in rooms and workplaces, random thermography, faucet and shower water consumption, electricity consumption and measurements of the proportion compressed air leakage or already mapping in industrial plants. Based on the results, solutions with a reasonable payback period are prepared for the customer, which, depending on the field, help to save 40-90% of energy costs.

Training and implementation

The audit service includes the presentation of a summary of the completed work and training on the proposed solutions so that our client does not receive another classic energy audit, which typically establishes the facts of the current situation, but does not offer a specific solution, payback periods and action plan.

The audit of DeltaE Engineering provides the client with specific solutions to improve the condition of the technical systems and proposes a further work plan based on the priorities. In addition, the audit provides a thorough overview of the energy consumption of each complex and the trends in electricity consumption.

After the contracting authority’s training, the client can decide whether to invest in the implementation of the solutions oneself or with our help. We are ready to finance our own solutions. We are so confident about savings!

The whole process of implementing energy saving solutions

Schedule of the usual
audit process

Stage
Timeline
Collecting source data 1. – 2. week
Conducting inspections 3. week
Carrying out measurements 3. – 4. week
Preparation of the audit report 4. – 6. week
Presentation and training 7. week
Confirming financing model 8. week
Implementation of solutions 8. week

Average results of energy saving solutions audits

Field
Savings
Payback
Electricity 10-15% 2 – 4 yrs
Lighting 70-90% 2 – 3 yrs
Water saving 20-30% 1 – 2 yrs
Heating-ventilation-cooling 20-30% 2 – 5 yrs
Building automation 20-40% 2 – 5 yrs
Compressed air and industrial solutions 20-40% 1 – 2 yrs
Solar energy 6 – 9 yrs

Energy saving solutions audit vs energy audit

DeltaE
audit
Energy audit
Energy cost mapping
Energy cost analysis
Preparation of recommendations
Technical mapping of utility systems
Carrying out thorough measurements
Developing the solutions
Establishing an implementation plan
Client training
Development of the financing model

Order an audit for your company

Contact us

Field references

Estanc AS

  • Object production complex
  • Size of object 11 500 m2
  • Average payback period 3,5 yrs
  • Number of solutions 13
  • Estimated investment 185 k€

Acino Estonia OÜ

  • Object production complex
  • Size of object 3 000 m2
  • Average payback period 5 yrs
  • Lahenduste arv 13
  • Hinnanguline investeering 145 k€

Clyde Bergemann Eesti AS

  • Object production complex
  • Size of object 7 300 m2
  • Average payback period 2 yrs
  • Number of solutions  14
  • Estimated investment  800 k€

Eesti Post AS

  • Object office building
  • Size of object 21 000 m2
  • Average payback period 3,8 yrs
  • Number of solutions 9
  • Estimated investment 350 k€

Neiser Group AS

  • Object production complex
  • Size of object 11 200 m2
  • Average payback period 6,8 yrs
  • Number of solutions  17
  • Estimated investment 450 k€

Värska Vesi AS

  • Object production complex
  • Size of object 7 500 m2
  • Average payback period 4,9 yrs
  • Number of solutions 15
  • Estimated investment 130 k€

Loginvest OÜ

  • Object logistics center
  • Size of object 33 000 m2
  • Average payback period 2,5 yrs
  • Number of solutions  17
  • Estimated investment 440 k€

Harju Elekter Elektrotehnika AS

  • Object production complex
  • Size of object 9 300 m2
  • Average payback period 3,2 yrs
  • Number of solutions  10

Järva vald

  • Object school
  • Size of object 7 800 m2
  • Average payback period 3,0 yrs
  • Number of solutions  16
  • Estimated investment 120 k€

Raum OÜ

  • Object production complex
  • Size of object 4 000 m2
  • Average payback period 4,5 yrs
  • Number of solutions  14
  • Estimated investment 50 k€

Lõuna-Eesti Haigla AS

  • Object hospital
  • Size of object 20 000 m2
  • Average payback period 5,25 yrs
  • Number of solutions 14
  • Estimated investment 725 k€

Karlskroona OÜ

  • Object warehouse complex
  • Size of object 5 000 m2
  • Average payback period 3,25 yrs
  • Number of solutions  8
  • Estimated investment  78 k€

RealWAY OÜ

  • Object office building
  • Size of object 3 700 m2
  • Average payback period 4,25 yrs
  • Number of solutions 12
  • Estimated investment 150 k€

MTG GRUPP OÜ

  • Obejct hospital
  • Size of object 8 500 m2
  • Average payback period 4,9 yrs
  • Number of solutions 10